Rail Transport

FARNBOROUGH RAILWAY STATION

The project is located at the Grade II Listed, main station building. Contractor Design elements were Mechanical & Electrical.

Works consisted of:

CRICKLEWOOD SIDINGS

Works on a new railway sidings at Cricklewood. At these new sidings, the Thameslink trains will be kept, cleaned and prepared for service. The works involved constructing new sub stations for electrical intakes.

  • Brickwork
  • Roofing
  • Scaffolding
  • Falsework
  • Concrete Works
  • Bitumen Coatings
  • Rendering