London Underground - Calibration Unit – Extension Project - Phases I & II

Description of Works; To convert a disused Warehouse/Store Area to a new workshop/laboratory unit. The Calibration dept. of LUL require a climate controlled work area with constant temperatures to enable their work of Re-Calibrating Survey & Gauging Equipment.

The project involved sectioning off a section of the warehouse, erecting insulated metal studwork partitions, new insulated Suspended ceilings, new lighting and small power, new Anti-Slip flooring, new extraction system for fumes, new Air Conditioning, Creation of Structural Openings to link the existing Caliberation Unit to the newly extended area, Tiling, Decorations & 2nd Fix Joinery.