- Home
- The Company
- What we do
- Case Study
- Principal Contractor
- Civils
- Commercial
- DDA Work
- Education
- Darwin Building, Regent’s College
- Garrat Park Primary School
- Heber School
- Kelston Religous Education Centre
- Regents College, Regents Park
- Reid Hall, Regent’s College
- Swaffield Primary School
- The Tate Library & Acland Building
- University of East London - Stratford Campus
- University of East London
- Westbridge Primary School
- Health
- Industrial
- Leisure
- Listed Building & Restoration
- Public Works
- Private Residential
- The GAP Site, Hastings
- The Gatehouse, Petersham
- The Sports Pavillion, Dulwich Common
- Whitton Timber, Peckham
- Green Technology
- Volumetric Construction
- Cladding & Facades
- Mechanical & Electrical
- Rail Contractor
- Brixton Station
- Clapham Junction Station
- Commercial Kitchen/Restaurant Fit Out
- Cross Rail - Paddington Central
- Engineering Workshop & Warehouse
- Express Chambers – Edgware Station
- LUL - Sundry Depots
- Lillie Bridge Rail Depot
- London Underground - Calibration Unit
- New Workshops & Storage Units
- Oxford Circus House
- Paddington Integrated Project Works - Crossrail
- Tubelines DSM Offices - Fit Out & Alterations
- Victoria Station - Terminus Place
- Façade Restorations
- Maintenance & Call Out
- Principal Contractor
- Accreditations
- Sectors
- News
28 Thurloe Street, South Kensington Station
The building at no. 28 Thurloe Street, owned by Transport for London is a 4 storey Victorian Building located adjacent to South Kensington Underground Station.
The access to the building is severely restricted being located in a pedestrianised zone beside one of Londons busiest Tube Stations.
The works consisted of the full strip out of the upper floors of no.28 and the conversion of the floors into 3 no. Apartments. Deliveries had to be carefully arranged and co-ordinated for which H.A Marks produced a full Traffic Management Plan.
Structural Repairs and alterations were undertaken and the entire stairs was replaced. H.A Marks designed and carried out a full Mechanical & Electrical services refit and the flats were finished to a very high standard.
The project was completed On Time and Budget and was a great success through working very closely with John Cobb & Associates and the Client.
| Attachment | Size |
|---|---|
| Click Here to download full case study | 1.33 MB |