- Home
- The Company
- What we do
- Case Study
- Principal Contractor
- Civils
- Commercial
- DDA Work
- Education
- Darwin Building, Regent’s College
- Garrat Park Primary School
- Heber School
- Kelston Religous Education Centre
- Regents College, Regents Park
- Reid Hall, Regent’s College
- Swaffield Primary School
- The Tate Library & Acland Building
- University of East London - Stratford Campus
- University of East London
- Westbridge Primary School
- Health
- Industrial
- Leisure
- Listed Building & Restoration
- Public Works
- Private Residential
- The GAP Site, Hastings
- The Gatehouse, Petersham
- The Sports Pavillion, Dulwich Common
- Whitton Timber, Peckham
- Green Technology
- Volumetric Construction
- Cladding & Facades
- Mechanical & Electrical
- Rail Contractor
- Brixton Station
- Clapham Junction Station
- Commercial Kitchen/Restaurant Fit Out
- Cross Rail - Paddington Central
- Engineering Workshop & Warehouse
- Express Chambers – Edgware Station
- LUL - Sundry Depots
- Lillie Bridge Rail Depot
- London Underground - Calibration Unit
- New Workshops & Storage Units
- Oxford Circus House
- Paddington Integrated Project Works - Crossrail
- Tubelines DSM Offices - Fit Out & Alterations
- Victoria Station - Terminus Place
- Façade Restorations
- Maintenance & Call Out
- Principal Contractor
- Accreditations
- Sectors
- News
Volumetric Modular Construction
H.A Marks Construction offer a full Turnkey Design and Build Service providing bespoke Volumetric/Modular buildings. Together with our Technical Partner Powerwall Spaceframes Systems Ltd
H.A Marks provide:-
- Feasibility Studies.
- Design – Full or Partial working with the Clients Team.
- Full Construction Services – Read more..
- Off site Manufacture of the Volumetric Modules at our own Factory.
- Transport & Installation on Site.
- Mechanical & Electrical Services – Read more..
- All Finishing works including a Range of Cladding & Insulated Render Systems – Read more..
The rapidly expanding area of Modern Methods of Construction has come sharply into focus in very recent years.
H.A Marks provide this MMC Service to:-
- Rail Companies
- Schools
- Student Accomodation
- Local Authorities
- Housing Associations
- Developers
- Nursing Home & Healthcare Providers
- Hotels – Budget Hotels
- Airports
Get
the Flash Player to see this player.
the Flash Player to see this player.
Benefits
The extraordinary benefits of off-site Volumetric Construction are;
Speed
Huge Program Time Savings can be made.
Factory Production and concurrent Site Working results in huge Time Savings where clients can utilise their asset quicker and generate income.
Bad weather delays are substantially less on volumetric projects.
Cheaper
Being faster, on-site Prelim costs are substantially reduced. Earlier completion dates help clients generate income from the new asset quicker.
Sub-Structure & Foundation costs are often substantially reduced due to the simple corner loaded system of construction.
Wastage – In conventional construction, material wastage is sometimes high due to damage, bad weather, over ordering etc. Factory production means significantly less waste.
Sustainability
Our bespoke Powerwall system meets and often exceeds code level 4 for Sustainability.
Site Waste is reduced by up to 90%
Thermal efficiency
Embodied Energy
For information click here to download the brochure.
Quality
Factory (Assembly Line) Production in controlled conditions to ISO standards gives a high quality build with less defects.
Appearance
The Powerwall bespoke system is flexible in design which enables us to achieve the original Architectural Flair & Vision intended for a given building.
A wide range of finishes are available, installed by H.A Marks Render & Claddings, our own in-house specialists.
A very wide range of finishes are available to the client and include;
Brick Slips
Insulated Render Systems
Terra Cotta
Zinc or a range of Metallic cladding systems.
Links to more information about Volumetric Construction:
Waste Reduction Potential of Offsite Volumetric Construction - A study highlighting the reduction in waste that is achieved when using Volumteric Construction - Click Here
