- Home
- The Company
- What we do
- Case Study
- Principal Contractor
- Civils
- Commercial
- DDA Work
- Education
- Darwin Building, Regent’s College
- Garrat Park Primary School
- Heber School
- Kelston Religous Education Centre
- Regents College, Regents Park
- Reid Hall, Regent’s College
- Swaffield Primary School
- The Tate Library & Acland Building
- University of East London - Stratford Campus
- University of East London
- Westbridge Primary School
- Health
- Industrial
- Leisure
- Listed Building & Restoration
- Public Works
- Private Residential
- The GAP Site, Hastings
- The Gatehouse, Petersham
- The Sports Pavillion, Dulwich Common
- Whitton Timber, Peckham
- Green Technology
- Volumetric Construction
- Cladding & Facades
- Mechanical & Electrical
- Rail Contractor
- Brixton Station
- Clapham Junction Station
- Commercial Kitchen/Restaurant Fit Out
- Cross Rail - Paddington Central
- Engineering Workshop & Warehouse
- Express Chambers – Edgware Station
- LUL - Sundry Depots
- Lillie Bridge Rail Depot
- London Underground - Calibration Unit
- New Workshops & Storage Units
- Oxford Circus House
- Paddington Integrated Project Works - Crossrail
- Tubelines DSM Offices - Fit Out & Alterations
- Victoria Station - Terminus Place
- Façade Restorations
- Maintenance & Call Out
- Principal Contractor
- Accreditations
- Sectors
- News
Private Residential
Pettiward Estates
Full strip out to apartment and re-configuration works including;
- Structural Alterations & Steelwork
- New Stairs & Joinery
- High End Flat Refurbishment.
- Bathrooms & Kitchen.
- Roof Top Terrace.
The works were carried out to a very high standard and completed under budget.Pettifore Street
»
The GAP Site, Hastings
A key feature of the project was the Castillated Facade required to the elevations.
H.A Marks designed and installed a light weight Metal Framing System which was self supported and hung off the main structural concrete frame in vertical 'Tiered' layers to achieve the required Castillated Profile.
We also installed the curved Insulated Render System in STO.
The front feature balcony known as the 'Porte Cocher' was rendered with a Sto Insulated Render System.
We also constructed the front Canopy using leightweight Metal Framing.
We supplied and fitted the associated metal flashing systems, Trims and Brickslip Facades as required.
»