- Home
- The Company
- What we do
- Case Study
- Principal Contractor
- Civils
- Commercial
- DDA Work
- Education
- Darwin Building, Regent’s College
- Garrat Park Primary School
- Heber School
- Kelston Religous Education Centre
- Regents College, Regents Park
- Reid Hall, Regent’s College
- Swaffield Primary School
- The Tate Library & Acland Building
- University of East London - Stratford Campus
- University of East London
- Westbridge Primary School
- Health
- Industrial
- Leisure
- Listed Building & Restoration
- Public Works
- Private Residential
- The GAP Site, Hastings
- The Gatehouse, Petersham
- The Sports Pavillion, Dulwich Common
- Whitton Timber, Peckham
- Green Technology
- Volumetric Construction
- Cladding & Facades
- Mechanical & Electrical
- Rail Contractor
- Brixton Station
- Clapham Junction Station
- Commercial Kitchen/Restaurant Fit Out
- Cross Rail - Paddington Central
- Engineering Workshop & Warehouse
- Express Chambers – Edgware Station
- LUL - Sundry Depots
- Lillie Bridge Rail Depot
- London Underground - Calibration Unit
- New Workshops & Storage Units
- Oxford Circus House
- Paddington Integrated Project Works - Crossrail
- Tubelines DSM Offices - Fit Out & Alterations
- Victoria Station - Terminus Place
- Façade Restorations
- Maintenance & Call Out
- Principal Contractor
- Accreditations
- Sectors
- News
Commercial
London Underground - Caliberation Unit – Extension Project - Phases I & II
Description of Works; To convert a disused Warehouse/Store Area to a new workshop/laboratory unit. The Calibration dept. of LUL require a climate controlled work area with constant temperatures to enable their work of Re-Calibrating Survey & Gauging Equipment.
The project involved sectioning off a section of the warehouse, erecting insulated metal studwork partitions, new insulated Suspended ceilings, new lighting and small power, new Anti-Slip flooring, new extraction system for fumes, new Air Conditioning, Creation of Structural Openings to link the existing Caliberation Unit to the newly extended area, Tiling, Decorations & 2nd Fix Joinery.
| Attachment | Size |
|---|---|
| Click Here for full case study | 2.5MB |
London Underground - Commercial Kitchen/Restaurant Fit Out
The scope of work included strip out of existing kitchen, make safe and adapt services, removal of existing floor and wall tiling and backing, new floor screed and wall plastering, new lighting, electric and gas services, new extract canopy, anti slip floor tiling, wall tiling, roof lights to staff offices off the kitchen, joinery and supply and installation of new kitchen equipment.
The program duration was short and important to our client. H A Marks scheduled noisy works not to occur around canteen busy periods and materials were carefully specified to aid the program. For example, the floor screed drying out times would have an effect on commencing the floor tiling.
»